When help is an hour out, the response is already on site.

Hazardous work. Remote ground. Response on hand.

Model
Construction / solar
Scope
Multi-state field sites
A construction worker carrying an AutoTQ weatherproof case across a job site

Illustrative coverage

Every site. Every crew. Stations at the office, the laydown yard and the substation, and a kit in each crew truck.

Laydown yardSite officeCrewtrailersSubstationArray 1Array 2Array 3Array 4Array 5Gate

Slide the drawing sideways to see the rest.

Press a station to see what is there.

Layers

11stations shown on this drawing

The drawing is an example, not a survey. A plan for your site starts from your own AED map.

Size it for your site

Count the places a crew gathers and the trucks that carry them. Each one becomes a point of response.

Your planConstruction & Energy

32AutoTQ kits

  • One at each site and laydown station12
  • One in each crew truck20
  • Unlimited training for your organization
  • Up to two full years of charge between uses
  • Cuffs replaced when a real use is reported

The minutes before help arrives

Field sites sit far from the nearest station. On remote ground the wait is longer, and the crew is the first response.

Press Run the clock.

A B C
  1. A

    0:15 AutoTQ is on. First-time users applied it in a mean of 15.07 seconds.

    AutoTQ studyFirst-Time Users: 36 Healthy Adult Volunteers
  2. B

    5:00 Severe blood loss can kill in as little as five minutes, the American College of Surgeons says.

    American College of Surgeons (opens in a new window)National Stop the Bleed Month, May 2025
  3. C

    13:00 Median time from the 911 call to EMS arriving on scene, rural areas. Nearly 1 of 10 rural encounters waited almost a half hour.

    JAMA Surgery, 2017 (opens in a new window)1,796,987 EMS encounters

The numbers

1,034

Workplace deaths in construction in 2024
The most of any private industry.

U.S. Bureau of Labor Statistics (opens in a new window)Fatal work injuries in 2024
1,468

Construction workers hospitalized in 2024
As reported by employers to federal OSHA, with another 231 amputations.

OSHA (opens in a new window)Severe injury reports, 2024 annual report
92%

First-Time User Success
92% of adults applied the AutoTQ® automatic tourniquet correctly on their first try under pressure after watching a 30-second demo.

AutoTQ studyFirst-Time Users: 36 Healthy Adult Volunteers
100%

Successful Arterial Occlusion
In testing, the AutoTQ® automatic tourniquet stopped blood flow from arteries on 100% of limbs up to 33 inches around.

AutoTQ studyArterial Occlusion: 27 Volunteers | 54 Limbs

Implementation

  1. 1

    Map

    Every crew, every site.

  2. 2

    Bless

    Medical director sign-off.

  3. 3

    Deploy

    Trucks, trailers, kits.

  4. 4

    Train

    The device coaches.

  5. 5

    Sustain

    USB-C. Free cuffs.

What goes where

All products
WhereWhatItem No.
Site offices and trailersAutoTQ® Automatic Tourniquet Kit
Wall Mount
Item1000-0005-TQ Item7000-WB
Laydown yards and outdoor postsAutoTQ® Automatic Tourniquet Kit
Weatherproof Case
Item1000-0005-TQ Item7000-CC
Crew trucksAutoTQ® Automatic Tourniquet Kit
Weatherproof Case
Extra Cuff Pack
Item1000-0005-TQ Item7000-CC Item7000-LS-P

When help is an hour out, the response is already on site.